In July 2022, CWSNC took over operations of the Kinnakeet WWTP and WWCS system. During the initial investigations of the WWTP, it was determined that the WWTP was not powered up to allow for treatment of the wastewater. Equipment within the WWTP was found to be inoperable, substandard by today’s standards, and have significant metal corrosion.
The WWTP was placed back into operation, by cleaning and rehabbing the operational systems, along with adding filters and disinfection system. Additionally, all lift station control panels in the WWCS were replaced. SCADA monitoring was added to the lift stations to reduce operator time from a daily basis to a weekly basis or called for by SCADA alerts.