ALERTS (2)
A utility worker climbing a large water tank ladder.

Welcome to
Utilities Inc. of Louisiana

Latest News

The System Improvement Project logo.

System Improvements In Your Community

May 19, 2025
  • Your Utility at Work

These updates, and more, can also be found on the System Improvements page of this site.

Bankston

  • Upgrading meters to Advanced Metering Infrastructure meters
  • New hydropneumatic tank
  • Upgrade treatment system
  • New submersible pump
  • New electrical panel
  • New storage tank (COMPLETED)

French Settlement

  • Upgrading meters to Advanced Metering Infrastructure meters
  • New water well to be located along Delia Street
  • New filtration units at the existing Mercy Lobell well
  • +/- 8k feet of new PVC water main currently being installed along Hwy 16
  • Dual booster pumps to be installed at French Settlement well
  • Revamp of all Wells including new electrical, level controls, treatment system, etc.

Hammond Heights

  • Upgrading meters to Advanced Metering Infrastructure meters
  • Revamp of all Wells including new electrical, level controls, treatment system, etc.
  • +/- 8k feet of new PVC water main along Whiskey Lane, TIn Can Alley, 1064, 1065, Fendalson
  • Dual booster pumps to be installed at French Settlement well
  • New water located along 1065
  • Dual booster pumps to be installed at Cockerham Well
  • Customers tied into new main along Whiskey Lane and Tin Can Alley.

Head of Island/Whitehall

  • Upgrading meters to Advanced Metering Infrastructure meters

Maurepas

  • Upgrading meters to Advanced Metering Infrastructure meters
  • New filtration units at the existing Simoneaux well site
  • Dual booster pumps to be installed at Simoneaux Well
  • New Bear Island well put in service
  • +/- 6k feet of new PVC water main currently being installed along Hwy 22
  • Revamp of all Wells including new electrical, level controls, treatment system, etc.

Pine Heaven

  • Upgrading meters to Advanced Metering Infrastructure meters (COMPLETED)
  • Electrical upgrades, including pump control panels and wiring (COMPLETED)
  • Upgrades to iron and manganese sequestering process (COMPLETED)
  • Upgrades to the disinfectant process (COMPLETED)

Velma

  • Upgrading meters to Advanced Metering Infrastructure meters
  • Revamp of all Wells including new electrical, level controls, treatment system, etc.

 

My Account

Our online self-service portal lets you manage your utility account Anytime Anywhere!

  • Manage your account 24/7
  • View and pay bills
  • Switch to Paperless Billing
  • Monitor usage and save money
  • Set up alerts and reminders
  • And More

Already have a My Account profile?

My Account Portal on 3 Types of Devices
Lead-Service-Lines-Survey-Homepage
home-slice-lead-service-lines-bkg

Check Your Lead Service Line

Lead Service Lines are a danger to health. Does yours contain lead? Do a simple test to find out, then complete our Survey.

Learn More About Lead
homepage-slice-baclground-water-running-into-kitchen-sink 

Learn About Water Service

How it safely reaches your home, and how we use it and protect it for the future is the focus of our Water 101 pages.

Learn More About Water
h2ome-water-text-slice-homepage
home-610x350-utility-worker-taking-water-sample
home-slice-water-quality-bkg

Water Quality in Our Service Areas

We follow U.S. EPA monitoring and testing protocols to ensure your drinking water is safe.

Learn More About Water Quality